Mobile
Log In Sign Up
Home > chinese-english > "shear crack" in English

English translation for "shear crack"

海冰受剪力产生的裂缝
剪切裂缝隙
剪切裂纹
剪切裂隙
切变裂缝
切变裂纹


Related Translations:
shearing:  刮布剪断剪毛剪切,剪割剪取的羊毛剪羊毛切变切断加工切割直立截槽法
shear:  vt.,vi.(sheared, 〔古语〕 shore; shorn , sheared)1.剪(羊毛等);修剪(树木);剪(呢绒的)长毛。2.〔诗〕(用剑)斩。3.【机械工程】剪断,切断;【矿物】截割;【物理学】(使)切变。4.剥夺;抢夺;骗取。5.〔苏格兰语〕(用镰刀)收割(庄稼)。6.飞起,如割开一般地越过。短语和例子shear sheep=shear wool fr
shear field:  剪切场切变场
shearing bar:  立截盘受剪力钢筋
scroll shears:  涡形剪床
shearing blades:  刮剪刀片
periscope shear:  潜望镜导筒
shearing vibration:  剪式振动
shear burst:  切力突出
shear thixotropy:  剪切触变性
Example Sentences:
1.The elastostatical problem of the energy release in a shear crack was first created by starr (1928) .
剪切裂缝中能量释放的弹性静力问题最先由Starr(1928)进行了研究。
2.After cutting , shear section shall be checked for no lamination and shear crack
切割后,应检验切割部分有无夹层,切割裂纹。
3.Electroelastic field for an impermeable anti - plane shear crack in a piezoelectric ceramics plate
压电陶瓷板中非电渗透型反平面裂纹的电弹性场
4.The elastostatical problem of the energy release in a shear crack was first created by starr ( 1928 )
剪切裂缝中能量释放的弹性静力问题最先由starr ( 1928 )进行了研究。
5.It can give vector of stress , and break factor and direction vector of tensive crack and shearing crack in the special observation planes ( for examples , in a stratal surface which is fluctuant in depth )
软件可视化包括:空间应力矢量(大小和方向) 、裂缝性态(张裂缝和剪裂缝发育程度及其方向矢量)在特定观察面(如沿起伏的地层面)上的展示。
6.The strain rate sensitivity would be increased with the increase of volume fraction of sic particles . the damage mechanism of sipc / al composites was dominated by the shear cracking of sic particles along the direction that was vertical to the loading
同时该复合材料存在应变率敏感性, sic含量的增加导致复合材料应变率敏感性的增加,以垂直于载荷方向的增强西安理工大学硕士学位论文相颗粒的剪切开裂为主要破坏模式。
7.( 2 ) according to the forming model of the deep pull cracks , they can be divided into three classes pulled cracks - , pressed cracks and sheared cracks . ( 3 ) based on the two - dimensional and three - dimensional finite element methods . the following results can be affirmed : in the slope excavating process , the base surface will rebound in the direction of the excavating surface ' s excerior normal . the maximal displacements of the left and right bank are + 3 . 6cm and + 2 . 4cm ; the arch abutment will rebound in the direction of the river valley , the maximal displacements of the two bank are + 3 . 5cm and + 2 . 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction . the maximal displacements are + 2 . 1cm and + 1 . 7cm . ( 4 ) the natural slope is stable
( 3 )通过二维及三维有限元分析得知,左右岸拱肩槽边坡在开挖过程中,开挖底面主要表现为朝开挖面外法线方向发生回弹,左右岸最大位移量分别为+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表现为向河谷方向发生侧向回弹,左右岸最大位移量分别为+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表现为向临空方向的回弹,左右岸最大位移量分别为+ 2 . 1cm 、 + 1 . 7cm ;开挖使岩体产生由卸荷回弹导致的倾倒拉裂现象。
Similar Words:
"shear coefficient of viscosity" English translation, "shear compliance" English translation, "shear component" English translation, "shear concrete stud" English translation, "shear cone" English translation, "shear creep" English translation, "shear crush zone" English translation, "shear curve" English translation, "shear cusps" English translation, "shear cut" English translation